The state-of-the-art SEGRO Logistics Park Oberhausen is a relatively young revitalisation project on a former colliery site with a total of three construction phases, of which the first two phases with 70,000 square metres are already fully let. Construction of the third and final construction phase with a total of 50,200 square meters of logistics, mezzanine and office space will begin in 2021. The speculative development will be built according to the latest standards for sustainable, ecological and energy-conscious building. The building envelope will be of high quality and insulated according to the latest standards and will meet the requirements of the KfW building standard "Efficiency House Level 40". The new property also supplies the green electricity itself - a photovoltaic system will be installed over the entire roof area. Phase 3 will be the first property in Germany that SEGRO strives to be awarded with the sustainability certificates DGNB Platinum and DGNB Climate Positive.
The well-being of our tenants in their work environment is also important to us: we therefore attach great importance to a lot of natural daylight and also offer seating in green surroundings.
After completion of the current phase, the Oberhausen logistics park will have a total of around 120,000 square meters of warehouse space on a total area of 21 hectares, located in the immediate vicinity of an existing SEGRO logistics centre.
Due to the very good transport links to the motorway interchange Oberhausen (A2 / A3) and the Duisburg inland port, the site is ideal for manufacturing as well as for distribution and fulfillment.
The new rental units will be ready for occupancy from August 2022.
Location
SEGRO Logistics Park Oberhausen is located in the heart of the Ruhr area with excellent connections to the motorway interchange Oberhausen (A2/A3) and the Duisburg inland harbour
DISTANCES
- A3 Oberhausen-Holten (11) = ca. 2 km
- A2 / A3 (motorway interchange Oberhausen) = ca. 3.8 km
- Duisburg inland harbour = ca. 18 km
- Düsseldorf Airport = ca. 35 km
PUBLIC TRANSPORTATION
- Bus line 959 “Im Lekkerland” = ca. 80 m
- Railway station Oberhausen-Holten = ca. 200 m
Specification
SUSTAINABLE ASPECTS
- Green electricity through photovoltaic system
- Efficiency house level 40: High-quality insulated building envelope according to the latest standard
- Aiming for DGNB Platinum and DGNB Climate Positive
SPECIFICATIONS
- Warehouse height: 12m clear height
- Roof: Sheet insulated roof with insulation according to GEG (German Buildings Energy Act)
- Windows: Aluminium windows with triple insulated glazing
- Warehouse floor: Reinforced concrete floor, joint-free. Designed for maximum permitted forklift loads of 50kN (≈ 5t) flatness tolerances according to DIN 18202, table 3, line 4
- Heating (district heating): designed for room temperatures up to 17° C (warehouse) / 20° C (offices/social rooms)
- Lighting: LED interior and exterior lighting
- Standard office configuration: Space divided according to tenants’ wishes, floor cable ducting (including electrical cabling, without data processing/IT cabling), suspended ceiling with integrated LED lighting, external sunlight protection (optional area cooling)
All areas will be handed over in accordance to German building regulations.
Accommodation Grid
| | sq ft | sq m |
---|
PHASE 3 - AVAILABLE FROM AUGUST 2022 | | | |
Unit 8 | Warehouse | 86,111 | 8,000 |
Unit 8 | Office | 1,938 | 180 |
Unit 8 | Mezzanine | 12,325 | 1,145 |
Unit 8 | Total | 100,374 | 9,325 |
Unit 9 | Warehouse | 73,625 | 6,840 |
Unit 9 | Office | 1,938 | 180 |
Unit 9 | Mezzanine | 12,325 | 1,145 |
Unit 9 | Total | 87,887 | 8,165 |
Unit 10 | Warehouse | 80,073 | 7,439 |
Unit 10 | Office | 1,938 | 180 |
Unit 10 | Mezzanine | 11,474 | 1,066 |
Unit 10 | Total | 94,485 | 8,685 |
Unit 11 | Warehouse | 68,448 | 6,359 |
Unit 11 | Office | 1,938 | 180 |
Unit 11 | Mezzanine | 11,464 | 1,065 |
Unit 11 | Total | 81,849 | 7,604 |
Unit 12 | Warehouse | 80,643 | 7,492 |
Unit 12 | Office | 1,938 | 180 |
Unit 12 | Mezzanine | 11,528 | 1,071 |
Unit 12 | Total | 94,109 | 8,743 |
Unit 13 | Warehouse | 68,932 | 6,404 |
Unit 13 | Office | 1,938 | 180 |
Unit 13 | Mezzanine | 11,528 | 1,071 |
Unit 13 | Total | 82,398 | 7,655 |