Steel Works Battersea is a purpose-built best in class industrial space offering three Grade A Industrial Units totalling 31,512 sq ft.
These units provide multi-level logistics space across ground, first and second floors for Class B8 (storage and distribution) and Class E(g)(ii)(iii)(light industrial).
Designed for a wide range of occupiers including option for ancillary office space.
Location
Steel Works is located in Battersea, which is in the heart of South West London.
Main access into Central London and the local areas is from A3205 (Battersea Park Road), further access centrally occurs via the Albert Bridge and Chelsea Bridge.
In addition to this local transport can be achieved from Clapham Junction, Queenstown Road train station and Battersea Power Station Underground station. These are all within a short walk of the subject site.
Accommodation
Building 1
Ground Floor - 5,561sq ft
First Floor - 5,128 sq ft
Second Floor - 2,106 sq ft
Total - 12,795 sq ft
Building 2
Ground Floor - 4,134 sq ft
First Floor - 4,176 sq ft
Second Floor - 4,179 sq ft
Total - 12,489 sq ft
Building 3
Ground Floor - 6,228 sq ft
Total - 6,228 sq ft
Terms
Terms - Available on application
Specification
- SITE CAPACITY - 400KVA TENANTS SUPPLY (CAN BE INCREASED TO 800KVA)
- SUPERIMPOSED LIVE LOAD: 5.0KN/M2
- GOODS LIFT 2,000 KG OF WEIGHT LOADING
- WC/SHOWER FACILITIES
- 8 CAR PARKING
- CYCLE STORAGE
- 135 PV PANELS (43.875 KILOWATT PEAK TOTAL OUTPUT)
- EV CHARGING
- TARGET BREEAM RATING: OUTSTANDING
- External Cladding: Euroclad cladding in Anthracite Grey for a modern, durable finish across all buildings
- Interior Finishes: Brilliant White internal walls and polished concrete flooring throughout, serrano coloured doors and black steel handrails
- Structural Features: Reinforced ground floor slab, high-performance insulation and fire-resistant materials
- Windows: Building 1 features a large, energy-efficient window on the first floor with Luminous Green frame
- Sustainability:
- 135 PV Panels across the site (43.875-Kilowatt Peak Total Output)
- Green roofs on Buildings 1 & 3
- Green walls including full facade green wall on Building 1 & 2
- 8 car parking spaces with 3 EV charging points
- Dedicated cycle storage
- Hedgehog and bat boxes to support a BREEAM Outstanding rating
- Lift Access: Two 2000kg weight of goods lifts in Buildings 1 & 2
- Security: 24/7 CCTV surveillance and secure access
- Grounds: Gravel margin zone and concrete edging surrounding the site
- Bathrooms (Fully accessible, on each floor of all buildings):
- Doc M compliant showers and sequential basin mixer taps for precise control
- Satin stainless steel grab rails, L-shaped shower curtain rail and weighted shower curtains for added durability and ease of use
- Shower seat and ring-only toilet seat for practicality