Located in a prime industrial location, Leftfield Basingstoke will comprise 2 new high specification industrial / warehouse units, designed for occupiers looking for best in class accommodation with strong ESG credentials.
Completion is anticipated within Q1 2026.
Leftfield Basingstoke benefits from being extremely well connected locally, regionally and nationally with J6 of the M3 being only 3 miles away and Basingstoke Town Centre 3.9 miles.
Location
Leftfield Basingstoke is accessed via Crockford Lane at its interchange with the A33 providing excellent connections to Reading and the M4. With links to the national motorway network via Junction 6 of the M3 only 3 miles away, the site has fantastic connectivity to London and the M25 to the east, and Southampton and the M27 to the south.
Accommodation
LB100
Warehouse - 93,190 sq ft (8,658 sq m)
Offices - 7,365 sq ft (684 sq m)
Total GIA - 100,555 sq ft (9,342 sq m)
LB23
Warehouse - 19,895 sq ft (1,848 sq m)
Offices - 3,380 sq ft (314 sq m)
Total GIA - 23,275 sq ft (2,162 sq m)
Terms
TERMS - The units will be available on a new Full Repairing and Insuring lease, for a term of years to be agreed.
Further information is available on request.
VAT - VAT is applicable.
EPC - The buildings EPC will be assessed on practical completion with EPC A+ being targeted.
PLANNING - The site has planning for B2 and B8 uses.
Specification
LB100
- 12.5m Eaves Height
- Secure Self-Contained Yard
- 50.0m Max Yard Depth
- First Floor Offices
- 7 Dock Level Loading Doors (1 Euro Door)
- 3 Level Access Loading Doors
- 50 Kn/M2 Floor Loading Capacity
- 500 kVA Power Supply
LB23
- 8.0m Eaves Height
- Secure Self-Contained Yard
- 32.3m Max Yard Depth
- First Floor Offices
- 3 Level Access Loading Doors
- 50 Kn/M2 Floor Loading Capacity
- 290 kVA Power Supply
SUSTAINABILITY
- 20% EV Charging to Each Unit EV Ducting to All Car Parking Spaces
- Net Zero Carbon Ready
- EPC A+ Targeted
- Air Source Heat Pumps to Office Accommodation
- 10% of Daylight Roof Panels
- BREEAM ‘Excellent’ Targeted
- Building Energy Monitoring System Installed as Standard
- PV Panels
- Positive Biodiversity Net Gain
- Bicycle Spaces