The property comprises a warehouse facility with ancillary offices of approximately 2,938.30 sq m (31,628 sq ft). The premises comprise a modern warehouse for mineral and paper storage fronted by administrative offices on three floors and with appropriate staff facilities.
The buildings are located approximately centrally on the site and comprise high bay single storey warehousing facilities to the north parts, whilst smaller ancillary office accommodation are attached to the south. The premises were originally constructed around 1999.
The warehouse accommodation is of a fairly standard type of construction and comprises a ground bearing floor slab with steel portal frame structure with plastic coated metal faced insulated cladding to walls and roofs at low level protected by an inner skin of blockwork and perforated by electrically operated sectional overhead loading doors and powder aluminium frame windows and metal faced personnel doors.
The south office portion of premises was similarly constructed but with a part two and part three-storey arrangement, its internal walling predominantly formed in blockwork with the upper floors in pre-cast concrete floor planks.
The upper floors to the office section are accessed via a passenger lift, a main staircase set within the main entrance area/stairwell and a secondary staircase towards the west.
Mains electricity, gas and water services are connected. Heating provisions are based on gas fired air blowers in the warehouse areas and comfort heating and cooling installations to the offer. Power is conventional three phase and single phase types.
There is a service yard and car parking provision for 20 vehicles.
The site area is approximately 0.63 hectares (1.56 acres).