Rare development opportunity in Greater Manchester!
	Full planning permission in place
	Situated in Rochdale – stunning location
	Planning permission in place for 2 x 4-bedroom detached new house and conversion of listed buildings into 2 x 4 & 5 bed detached houses
	To view planning application please click here Planning application number 22/00999/LBC
	Builder and quote estimate in place for works
	Fantastic residential location close to Rochdale Town Centre / strong resale and rental demand
	Quick completion required
	No stamp duty
	Potential to sell or refinance in the future to release equity
	No s106 to pay
	Site has planning for conversion and part demolition of listed properties and barns to form the following -
	New build Detached Property
	3 beds on first floor and 1 bed on ground floor – Detached – 155 square metres plus garage – Estimated value worth £450,000-£500,000
	New Build Detached Property
	3 beds on first floor and 1 bed on ground floor – Detached – 168 square metres plus garage – Estimated value worth £550,000
	Conversion of Listed Building 1
	Detached – 5 bedroom - 207 square metres – Estimated value worth £650,000
	Conversion of Listed Building 2
	Detached – 4 bedroom - 230 square metres Estimated value worth £700,000
	Potential total estimated market value worth approx. £2,475,000
Accommodation
	New Build Detached Property (3 bed of FF & 1 bed on GF) - 1,667 sq ft
	New Build Detached Property (3 bed of FF & 1 bed on GF) - 1,807 sq ft
	Conversion of Listed Building 1 (5 bedroom) - 2,227 sq ft
	Conversion of Listed Building 2 (4 bedroom) - 2,474 sq ft
Terms
	Financial Breakdown
	Cash Price agreed at just £635,000 for a quick sale
	Development Costs approx - £850,000
	Final Site Value (Estimated) - £2,475,000
	Estimated Profit - £945,950
	Stamp Duty - £0
	Clauses
	The land acquired comprises the existing listed building on site as well as two building plots
	Under the transfer the whole site has rights to connect into services and has its own access on to the adopted highway at the top of the site
	There are obligations affecting the listed building only which are as follows:
	You or the owner of the land must commence the works to the listed building by 9 April 2025 and complete the works by 9 December 2026.
	If the works are not commenced by 9 April 2025 or completed by 9 December 2026 then the seller can do one of the following:
	(a)    Complete the works themselves and recover the cost back from the land owner; or
	(b)    Require the transfer back to them of the listed building in the sum - confirmed through solicitors
	Please note that this only affects the listed building land. The two building plots are not affected by the above provisions.
	Under the transfer the whole site has rights to connect into services and has its own access on to the adopted highway at the top of the site.
	Please note
	This sale must be purchased along with the current company set up for this development.