The site forms a very rare brownfield powered land redevelopment opportunity being the former ARBRE Energy Project which was one of the UK's earliest biomass power generating schemes. Whilst the original facility is decommissioned, the site retains the legacy of its energy infrastructure and strategic grid position.
The site could be suitable for a range of energy, industrial and infrastructure led power intensive uses subject to planning and statutory consents.
Location
Strategic location immediately adjacent to the A19
Junction 34 of the M62 1.2 miles to the south offering excellent east-west connectivity across Yorkshire and Humber.
A1(M) accessible via Junction 33 of the M62 providing direct north south connectivity
Excellent access to the Humber Ports including Goole, Hull and Immingham.
Accommodation
Site Area: The site area extends to 11.21 acre (4.53ha)
Terms
Terms: The property is available to purchase as a whole on a Freehold basis under Land Registry Title number NYK122556.
Business Rates: Current Rateable Value (from 1 April 2026): £95,500. Description: Store and Premises.
Legal Costs: Each party will be responsible from the payment of their own legal costs incurred.
VAT: All figures are quoted exclusive of VAT which may apply.
Planning: The site is unallocated for planning uses in the Selby Local Plan. A new county wide combined North Yorkshire Local Plan in currently in its initial scoping consultation stage with first formal 'gateway checkpoint expected in April 2027.
Historical planning consents on the site:-
C8/53/125F/PA – Electricity generating plant using wood fuel together with ancillary plant and buildings (January 1997)
C8/53/125F/PA – Change of use from a biomass renewable energy facility to waste management facility with advanced thermal treatment (May 2015).
Interested parties are advised to make their own enquirers with the Local Planning Authority (North Yorkshire Council).
Utilities & Infrastructure: All mains services power, gas, water and drainage are connected to the site.
POWER
Existing 66kV grid connected infrastructure.
NPG connection offer for up to 20MW export capacity and 8.42 MVA import capacity.
Existing connection infrastructure accepted by NPG and progressed through the network connection process.
NESO Connection reform confirmation for 15MW waste-to-energy element secured for gate 2 Phase 1.
Interested parties should undertake their own investigations regarding connection capacity, transferability and future grid connection arrangements.